LRC65-02 build contract signed

2023, Hindeloopen (NL) — Aluboot signed the contract to build LRC65-02. The second LRC65 will be, to a large extent, similar to the LRC65-01, but the layout still needs to be finalized.

The wheelhouse will get the same layout, whereas the front of the vessel will host a lovely lounge with an office and a large stateroom with a king-size bed and excellent bathroom facilities. The guest stateroom will have two separate beds.

The vessel will get parallel hybrid propulsion, a gyro stabilizer, airconditioning, and a solar panel arrangement for a total yield of 7,8 kWh. The build is scheduled to start in April 2023.

Previous
Previous

LRC65-02 build started

Next
Next

XPM78-02 DP and Factory Acceptance Testing